M2: | 1 | ||||
---|---|---|---|---|---|
AUDITORIO | $/M2: | 33997 | |||
IMPORTE TOTAL | MXN: | 33997 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES Y EXCAVACIONES | 0.96% | 326.3712 | |||
CIMENTACION | 8.55% | 2906.7435 | |||
ESTRUCTURA | 21.20% | 7207.364 | |||
FACHADA | 6.83% | 2321.9951 | |||
ALBAÑILERIA | 2.51% | 853.3247 | |||
PLAFONES | 2.89% | 982.5133 | |||
CARPINTERIA | 1.90% | 645.943 | |||
RECUBRIMIENTOS | 2.32% | 788.7304 | |||
CANCELERIA | 3.73% | 1268.0881 | |||
MUEBLES DE BAÑO | 1.01% | 343.3697 | |||
INST. HIDROSANITARIA | 0.28% | 95.1916 | |||
INST. PCI | 1.30% | 441.961 | |||
DETECCION DE HUMOS | 0.84% | 285.5748 | |||
LUMINARIAS | 1.95% | 662.9415 | |||
INST. ELECTRICA | 4.48% | 1523.0656 | |||
VYD | 0.29% | 98.5913 | |||
HVAC | 5.92% | 2012.6224 | |||
ILUMINACION ESCENICA | 2.77% | 941.7169 | |||
VESTIMENTA TEATRAL | 5.85% | 1988.8245 | |||
MECANICA TEATRAL | 5.66% | 1924.2302 | |||
AUDIO | 5.62% | 1910.6314 | |||
CCTV | 1.04% | 353.5688 | |||
SEÑALIZACION | 0.19% | 64.5943 | |||
SISTEMA DE CINE | 8.91% | 3029.1327 | |||
BUTACAS | 3.00% | 1019.91 | |||
0 | 33997 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
Cine-teatro para 300 personas, estrado, privados para expositores, baños para publico. Cimentación; Contratrabes y losa de cimentación, Estructura; columnas y armaduras metálicas, con cubierta. losacero, muros exteriores de precolado, interiores, block y panel de yeso, fachada de cristal templado. Aire acondicionado, sistema de sonido y proyector de 36 mm., sistema de iluminación, profesional, telones y butacas. | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
BODEGA | $/M2: | 5573.1 | |||
IMPORTE TOTAL | MXN: | $5,573.10 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES Y EXCAVACIONES | 2.24% | $124.84 | |||
TERRACERIAS | 4.44% | $247.45 | |||
CIMENTACION | 8.97% | $499.91 | |||
ESTRUCTURA | 41.86% | $2,332.90 | |||
CUBIERTA | 14.31% | $797.51 | |||
ALBAÑILERIA | 18.68% | $1,041.06 | |||
HERRERIA | 0.43% | $23.96 | |||
DRENAJE | 1.95% | $108.68 | |||
INST. ELECTRICA | 4.46% | $248.56 | |||
PARARRAYOS | 2.24% | $124.84 | |||
LIMPIEZA | 0.42% | $23.41 | |||
0 | $5,573.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
Cimentación de bodega zapatas aisladas, cimentación de muros zapatas corridas, piso de 18 cm. de espesor doble armado. Estructura metálica a base de marcos formados con placa de acero y canal mon-ten. Muros de block con dalas y castillos acabado aparente hasta 4 m. de altura. Lámina en muros del N+4.00 al N+ 8.00 m. Cubierta de lámina KR-18 y lámina 100 % acrílica, Bajadas de aguas pluviales y drenaje, Instalación eléctrica para iluminación. | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
CLUB DEPORTIVO | $/M2: | 15521.2 | |||
IMPORTE TOTAL | MXN: | $15,521.20 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES | 1.71% | $265.41 | |||
CIMENTACION | 9.73% | $1,510.21 | |||
ALBERCA | 9.11% | $1,413.98 | |||
ESTRUCTURA | 22.71% | $3,524.86 | |||
ALBAÑILERIA | 5.63% | $873.84 | |||
CUBIERTA | 5.34% | $828.83 | |||
PISOS | 8.03% | $1,246.35 | |||
RECUBRIMIENTOS Y JARDINERIA | 4.08% | $633.26 | |||
MUEBLES DE BAÑO | 4.81% | $746.57 | |||
INST. HIDROSANITARIA | 3.37% | $523.06 | |||
INST. ELECTRICA | 6.60% | $1,024.40 | |||
CANCELERIA | 7.37% | $1,143.91 | |||
HERRERIA | 1.88% | $291.80 | |||
INST. PCI | 2.23% | $346.12 | |||
AUDIO | 2.59% | $402.00 | |||
MOBILIARIO | 4.03% | $625.50 | |||
PARARRAYOS | 0.78% | $121.07 | |||
0 | $15,521.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
Cimentación: zapatas aisladas y zapatas corridas, piso de 15 cm. de espesor doble armado. Estructura; columnas de concreto y metálicas, entrepiso losacero con vigas de acero. Muros: exteriores de block con dalas y castillos, interiores panel. Cubierta a base de lámina Multypanel de 1 1/2″ de espesor. Piso: areas deportivas tipo Nora, demás areas mármol nacional, Alberca veneciano. | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
DEPARTAMENTO (NIVEL MEDIO) | $/M2: | 21205.21 | |||
IMPORTE TOTAL | MXN: | $21,205.20 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES | 0.11% | $23.33 | |||
EXCAVACIONES | 1.92% | $407.14 | |||
CIMENTACION | 6.47% | $1,371.98 | |||
SEMISOTANO | 7.37% | $1,562.82 | |||
ESTRUCTURA | 12.78% | $2,710.02 | |||
ALBAÑILERIA | 13.88% | $2,943.28 | |||
ACABADOS | 18.17% | $3,852.98 | |||
HERRERIA | 1.14% | $241.74 | |||
CANCELERIA | 3.87% | $820.64 | |||
CARPINTERIA | 8.62% | $1,827.89 | |||
MUEBLES DE BAÑO | 4.46% | $945.75 | |||
INST. HIDROSANITARIA | 2.36% | $500.44 | |||
INST. ELECTRICA | 7.33% | $1,554.34 | |||
INST. GAS | 0.68% | $144.20 | |||
JARDINERIA | 0.06% | $12.72 | |||
LIMPIEZA Y SEG. OBRA | 1.54% | $326.56 | |||
ELEVADOR Y EQUIPOS | 4.37% | $926.67 | |||
COCINA | 4.87% | $1,032.69 | |||
0 | $21,205.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
Edificio de 20 departamentos de nivel medio alto, 5 niveles mas sótano para estacionamiento, elevador para 8 personas y caseta de vigilancia. Departamento tipo: estancia, comedor, cocina , cuarto de lavado, 3 recamaras, 2 clósets, 1 vestidor, 2 1/2 baños, estacionamiento para dos automóviles | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
ESCUELA | $/M2: | 8147.4 | |||
IMPORTE TOTAL | MXN: | $8,147.40 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES | 3.59% | $292.49 | |||
TERRACERIA | 3.87% | $315.30 | |||
CIMENTACION | 12.28% | $1,000.50 | |||
ESTRUCTURA | 36.56% | $2,978.69 | |||
ALBAÑILERIA | 10.20% | $831.03 | |||
ACABADOS | 6.69% | $545.06 | |||
HERRERIA Y CANCELERIA | 6.29% | $512.47 | |||
PUERTAS | 2.67% | $217.54 | |||
MUEBLES DE BAÑO | 2.35% | $191.46 | |||
INST. HIDROSANITARIA | 1.70% | $138.51 | |||
LUMINARIAS | 5.64% | $459.51 | |||
INST. ELECTRICA | 6.83% | $556.47 | |||
LIMPIEZA | 1.34% | $109.18 | |||
0 | $8,148.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
12 aulas de 6.30×6.48 m, baños y dirección escolar. Cimentación; zapatas aisladas, contratrabes, muros de concreto y block, piso de 12 cm. de espesor armado. Columnas, muros, escalera, trabes y losas de concreto armado, acabado aparente. Muros de block con dalas y castillos acabado aparente, barandal de PTR; puertas de lámina esmaltada. Canceles de aluminio con cristal claro de 6 mm, luminarias tipo led. | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
ESTACIONAMIENTO (EDIFICIO) | $/M2: | 7007.1 | |||
IMPORTE TOTAL | MXN: | $7,007.10 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES | 0.48% | $33.63 | |||
CIMENTACION | 20.43% | $1,431.55 | |||
EXCAVACIONES Y RELLENO | 3.03% | $212.32 | |||
ESTRUCTURA | 53.03% | $3,715.87 | |||
ALBAÑILERIA | 6.50% | $455.46 | |||
ACABADOS | 0.52% | $36.44 | |||
HERRERIA | 0.26% | $18.22 | |||
INST. HIDROSANITARIA | 1.03% | $72.17 | |||
INST. ELECTRICA | 3.64% | $255.06 | |||
LUMINARIAS | 2.84% | $199.00 | |||
INST. PCI | 1.95% | $136.64 | |||
LIMPIEZA | 1.30% | $91.09 | |||
ELEVADOR | 4.43% | $310.41 | |||
PARARRAROS | 0.56% | $39.24 | |||
0 | $7,007.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
Edificio de estacionamiento de 5 niveles de construcción y 6 niveles utiles incluyendo la azotea, elevador para 8 personas y caseta de vigilancia. Cimentación a base de pilas, contratrabes, columnas y losa de concreto, instalación eléctrica, luminarias fluorescentes y bajadas de agua pluvial | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
GIMNASIO | $/M2: | 13786.6 | |||
IMPORTE TOTAL | MXN: | $13,786.60 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES | 1.13% | $155.79 | |||
TERRACERIAS | 2.18% | $300.55 | |||
CIMENTACION Y FIRME | 14.53% | $2,003.19 | |||
ESTRUCTURA | 33.63% | $4,636.43 | |||
ALBAÑILERIA | 8.73% | $1,203.57 | |||
RECUBRIMIENTOS | 4.17% | $574.90 | |||
PISOS DE MADERA | 6.78% | $934.73 | |||
HERRERIA | 0.77% | $106.16 | |||
CANCELERIA | 2.50% | $344.67 | |||
CARPINTERIA | 0.38% | $52.39 | |||
MUEBLES DE BAÑO | 5.65% | $778.94 | |||
INST. HIDROSANITARIA | 3.57% | $492.18 | |||
INST. ELECTRICA | 7.33% | $1,010.56 | |||
INST. PCI | 1.36% | $187.50 | |||
PARARRAYOS | 4.28% | $590.07 | |||
EQUIPAMIENTO DEPORTIVO | 1.27% | $175.09 | |||
AUDIO | 1.74% | $239.89 | |||
0 | $13,787.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
Cimentación de gimnasio zapatas aisladas, cimentación de muros zapatas corridas, piso de 15 cm. de espesor doble armado. Estructura; columnas de concreto, cubierta metálica con trabes conformada de placas de acero y canal mon-ten. Muros de block Novamuro con dalas y castillos aparentes. Cubierta a base de lamina Multypanel de 1 1/2″ de espesor. Piso de duela de encino, gradas laterales, zona de regaderas y baños para deportistas y visitantes. | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
HOTEL | $/M2: | 19069.59 | |||
IMPORTE TOTAL | MXN: | $19,069.60 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES | 0.19% | $36.23 | |||
TERRACERIAS | 0.62% | $118.23 | |||
CIMENTACION | 4.35% | $829.53 | |||
ESTRUCTURA | 14.30% | $2,726.95 | |||
ALBAÑILERIA | 5.96% | $1,136.55 | |||
AZOTEAS | 1.15% | $219.30 | |||
MUROS DIVISORIOS Y FACHADA | 10.69% | $2,038.54 | |||
ACABADOS | 9.39% | $1,790.64 | |||
MUEBLES | 3.57% | $680.78 | |||
CANCELERIA | 2.56% | $488.18 | |||
CARPINTERIA | 7.43% | $1,416.87 | |||
INST. HIDROSANITARIA | 5.77% | $1,100.32 | |||
EQUIPOS | 5.10% | $972.55 | |||
INST. ELECTRICA | 7.45% | $1,420.69 | |||
HVAC | 11.25% | $2,145.33 | |||
INST. PCI | 4.39% | $837.16 | |||
INST. DE GAS | 0.13% | $24.79 | |||
OBRAS EXTERIORES | 5.70% | $1,086.97 | |||
0 | $19,070.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
Hotel de 108 habitaciones, de 22 m2, lobby, sanitarios, comedor, servicios administrativos, 2 elevadores y ropería. Estacionamiento para 60 automóviles, motor lobby, jardineras, anden, cisterna, casa de máquinas. | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
RESTAURANTE | $/M2: | 23915.1 | |||
IMPORTE TOTAL | MXN: | $23,915.10 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES | 2.48% | $593.09 | |||
CIMENTACION | 9.14% | $2,185.84 | |||
ESTRUCTURA | 17.55% | $4,197.10 | |||
ALBAÑILERIA | 4.92% | $1,176.62 | |||
ACABADOS | 10.55% | $2,523.04 | |||
MOBILIARIO | 2.23% | $533.31 | |||
HERRERIA Y CANCELERIA | 3.37% | $805.94 | |||
MUEBLES DE BAÑO | 1.55% | $370.68 | |||
INST. HIDROSANITARIA | 4.65% | $1,112.05 | |||
INST. PCI | 3.47% | $829.85 | |||
INST. ELECTRICA | 5.38% | $1,286.63 | |||
HVAC | 11.34% | $2,711.97 | |||
AUDIO Y CTV | 1.23% | $294.16 | |||
OBRAS EXTERIORES | 2.85% | $681.58 | |||
JARDINERIA | 1.08% | $258.28 | |||
INST. DE GAS | 0.87% | $208.06 | |||
COCINA | 11.68% | $2,793.28 | |||
JUEGOS | 5.04% | $1,205.32 | |||
LIMPIEZA | 0.62% | $148.27 | |||
0 | $23,915.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
Restaurante áreas; mesas = 339 m2, cocina = 147, servicios = 115, equipos = 39 m2. Cisterna 75 m3, Cimentación: contratrabes y zapatas, Estructura; columnas de concreto, con cubierta metálica multypanel y losacero, muros de block con castillos y dalas. Aire acondicionado, sistema de audio y tv., sistema contra incendio, Estacionamiento y áreas exteriores 600 m2 | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
TIENDA EN PLAZA COMERCIAL | $/M2: | 16649.8 | |||
IMPORTE TOTAL | MXN: | $16,649.80 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
DESMONTAJES | 0.24% | $39.96 | |||
PREELIMINARES | 1.07% | $178.15 | |||
ALBAÑILERIA | 2.29% | $381.28 | |||
MUROS Y PLAFONES | 7.11% | $1,183.80 | |||
RECUBRIMIENTOS | 9.42% | $1,568.41 | |||
CANCELERIA | 3.54% | $589.40 | |||
PUERTAS | 1.71% | $284.71 | |||
MOBILIARIO | 27.70% | $4,611.99 | |||
FACHADA | 4.40% | $732.59 | |||
INST. ELECTRICA | 3.74% | $622.70 | |||
LUMINARIAS | 10.59% | $1,763.21 | |||
INST. HIDROSANITARIAS | 0.59% | $98.23 | |||
HVAC | 16.42% | $2,733.90 | |||
DETECCION DE HUMOS | 2.90% | $482.84 | |||
INST. ESPECIALES | 5.64% | $939.05 | |||
ACARREROS | 1.94% | $323.01 | |||
LIMPIEZA | 0.70% | $116.55 | |||
0 | $16,650.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
Tienda de rapa en plaza comercial, contempla: Area de exibición y ventas, mobiliario, probadores y bodega con baño. Contempla; tapiales, desmontajes, nivelación de pisos, recubrimientos, mobiliario, fachada de cristal templado e instalaciones. Se toma en cuenta que la plaza suministra; alimentación, eléctrica, hidráulica, agua helada, descarga sanitaría | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
VIVIENDA INTERES SOCIAL | $/M2: | 5661.6 | |||
IMPORTE TOTAL | MXN: | $5,661.60 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES | 3.62% | $204.95 | |||
CIMENTACION | 12.17% | $689.02 | |||
ESTRUCTURA | 35.24% | $1,995.15 | |||
ALBAÑILERIA | 22.77% | $1,289.15 | |||
PUERTAS Y VENTANAS | 5.56% | $314.78 | |||
PISOS Y AZULEJOS | 1.31% | $74.17 | |||
PINTURA Y PASTAS | 4.44% | $251.38 | |||
MUEBLES DE BAÑO | 3.39% | $191.93 | |||
INST. HIDROSANITARIA | 3.94% | $223.07 | |||
INST. ELECTRICA | 4.23% | $239.49 | |||
INST. DE GAS | 0.54% | $30.57 | |||
JARDINERIA | 1.04% | $58.88 | |||
LIMPIEZA | 1.75% | $99.08 | |||
0 | $5,662.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022. | |||||
INFORMACION DEL PROYECTO: | |||||
P.B. Estancia, comedor, cocina, estudio, 1/2 baño, jardín, garaje para 2 autos, 1er N. 3 recamaras, 3 baños, 1 vestidor, 2° N. 1 recamara, cuarto de servicio, 2 baños, cuarto de lavado, patio de servicio. | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
VIVIENDA NIVEL MEDIO | $/M2: | 14159.2 | |||
IMPORTE TOTAL: | MXN: | $14,159.20 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES | 1.29% | $182.65 | |||
CIMENTACION | 7.02% | $993.98 | |||
ESTRUCTURA | 25.39% | $3,595.02 | |||
ALBAÑILERIA | 13.40% | $1,897.33 | |||
ACABADOS | 14.97% | $2,119.63 | |||
HERRERIA | 1.45% | $205.31 | |||
ALUMINIO | 4.31% | $610.26 | |||
CARPINTERIA | 11.77% | $1,666.54 | |||
MUEBLES DE BAÑO | 3.54% | $501.24 | |||
INST. HIDROSANITARIA | 5.50% | $778.76 | |||
INST. ELECTRICA | 5.86% | $829.73 | |||
INST. DE GAS | 0.74% | $104.78 | |||
JARDINERIA | 0.20% | $28.32 | |||
LIMPIEZA | 0.73% | $103.36 | |||
COCINA/OTROS | 3.83% | $542.30 | |||
0 | $14,159.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022. | |||||
INFORMACION DEL PROYECTO: | |||||
P.B. Estancia, comedor, cocina, estudio, 1/2 baño, jardín, garaje para 2 autos, 1er N. 3 recamaras, 3 baños, 1 vestidor, 2° N. 1 recamara, cuarto de servicio, 2 baños, cuarto de lavado, patio de servicio. | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
VIVIENDA RESIDENCIAL | $/M2: | 22528.3 | |||
IMPORTE TOTAL | MXN: | $22,528.30 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES | 1.94% | $437.05 | |||
CIMENTACION | 8.70% | $1,959.96 | |||
ESTRUCTURA | 18.57% | $4,183.51 | |||
ALBAÑILERIA | 12.76% | $2,874.61 | |||
CUBIERTAS | 8.36% | $1,883.37 | |||
ACABADOS | 12.20% | $2,748.45 | |||
HERRERIA | 5.07% | $1,142.18 | |||
CANCELERIA | 3.26% | $734.42 | |||
CARPINTERIA | 10.63% | $2,394.76 | |||
MUEBLES DE BAÑO | 2.59% | $583.48 | |||
INST. HIDROSANITARIA | 2.72% | $612.77 | |||
INST. ELECTRICA | 2.68% | $603.76 | |||
LUMINARIAS | 1.83% | $412.27 | |||
INST. DE GAS | 0.27% | $60.83 | |||
AIRE ACONDICIONADO | 4.35% | $979.98 | |||
JARDINERIA | 0.42% | $94.62 | |||
LIMPIEZA | 1.47% | $331.17 | |||
COCINA INTEGRAL | 2.18% | $491.12 | |||
0 | $22,528.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
P.B. Estancia, comedor, cocina, estudio, 1/2 baño, jardín, garaje para 2 autos, 1er N. 3 recamaras, 3 baños, 1 vestidor, 2° N. 1 recamara, cuarto de servicio, 2 baños, cuarto de lavado, patio de servicio. | |||||
M2: | 1 | ||||
---|---|---|---|---|---|
OFICINAS INTERIORES (REMODELACION) | $/M2: | 14175.7 | |||
IMPORTE TOTAL | MXN: | $14,175.70 | |||
DESCRIPCION | % | IMPORTE (MXN) | |||
PREELIMINARES Y DEMOLICION | 2.68% | $379.91 | |||
ALBAÑILERIA | 6.79% | $962.53 | |||
ACABADOS | 14.18% | $2,010.11 | |||
HERRERIA | 0.88% | $124.75 | |||
ALUMINIO | 7.83% | $1,109.96 | |||
MOBILIARIO | 36.29% | $5,144.36 | |||
CARPINTERIA Y CERRAJERIA | 8.78% | $1,244.63 | |||
LUMINARIAS | 13.15% | $1,864.10 | |||
MUEBLES Y ACCESORIOS | 0.19% | $26.93 | |||
JARDINERAS | 4.89% | $693.19 | |||
BRANDING Y SEÑALETICA | 2.87% | $406.84 | |||
LIMPIEZA | 1.47% | $208.38 | |||
0 | $14,176.00 | ||||
PRESUPUESTO PREELIMINAR PARAMETRICO. DEBE REVISARSE CON UNO FINAL. 2022 | |||||
INFORMACION DEL PROYECTO: | |||||
42 estaciones de trabajo. 1 SJ 6p. 1 SJ 6p. 1 SJ 4p. 1 Privado. 2 casuals. 5 Phonebooths. 2 OTO + 3 focus privados. Bodega. Area de café e impresión. | |||||
PRECIO POR CATEGORIA: OFICINAS | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
CONCEPTO | Economica | Intermedio | Cara/ejecutivo | |||||||||||||
Vinilico | 10 | 50 | 100 | |||||||||||||
Alfombra | 10 a 20 | 20 a 40 | 40 a 80 | |||||||||||||
Duela de madera | 20 a 30 | 30 a 100 | 100 a 250 | |||||||||||||
Deck de madera | 20 a 30 | 30 a 60 | 60 a 150 | |||||||||||||
Laminados | 15 a 25 | 25 a 45 | 45 a 80 | |||||||||||||
Superficies solidas | 170 a 300 | 350 | 400 a 900 | |||||||||||||
Tapiz | 25 | 50 | ||||||||||||||
Textil acustico | 50 | 80 | ||||||||||||||
Marmol | 50 a 100 | 100 a 200 | 200 a 400 | |||||||||||||
Chapa de madera Nat. | 10 a 20 | 20 a 40 | 40 a 80 | |||||||||||||
Chapa de madera Sint. | 20 a 50 | 50 a 100 | 100 a 200 | |||||||||||||
Pintura Vinilica | 5 a 25 | |||||||||||||||
Pintura Esmalte | 10 a 50 | |||||||||||||||
Luminarias | 20 a 60 | 40 a 120 | 80 a 250 | |||||||||||||
Muebles de linea | 180 | 280 a 350 | 450 | |||||||||||||
Plafones | 15 a 100 | 25 a 200 | Mayor | |||||||||||||
Plantas y elem. naturales | 10 a 20 | 20 a 40 | 40 a 80 | |||||||||||||
Obras de arte y decorativos | 10 a 50 | 50 a 100 | 100 a 200 | |||||||||||||
Señalizacion y rotulacion | 5 a 10 | 10 a 20 | 20 a 50 | |||||||||||||
Unidad: | USD/m2 | |||||||||||||||
Precios del año: | 2023 | |||||||||||||||
Consideraciones adicionales: Los precios son aproximados y pueden variar significativamente dependiendo de la ubicación, la calidad de los materiales, la complejidad del diseño y otros factores. Es importante consultar con contratistas y diseñadores de interiores locales para obtener presupuestos más precisos para su proyecto específico. Los costos adicionales pueden incluir el diseño de interiores, la instalación de sistemas eléctricos y de datos, la mudanza y el almacenamiento de muebles. | ||||||||||||||||